{"list":[{"id":"69","catid":"43","userid":"1","username":"admin","title":"How to order fast door?","title_style":"","thumb":"","keywords":"","description":"Since our fast doors are custom-made production, so after determining the purchase..","content":"
\r\n\t \r\n<\/p>\r\n
\r\n\t
\r\n<\/p>\r\n
\r\n\t \r\n<\/p>\r\n
\r\n\t
\r\n<\/p>\r\n
","url":"\/index.php?m=News&a=show&id=57&l=en","template":"","posid":"1","status":"1","recommend":"0","readgroup":"","readpoint":"0","listorder":"0","hits":"845","createtime":"1447899430","updatetime":"1447899430","lang":"4","pic":"","posimg":"","source":"","date":"2015-11-19"},{"id":"56","catid":"41","userid":"1","username":"admin","title":"Industrial quick gate industry which need to pay attention to the problem?","title_style":"","thumb":"","keywords":"","description":"","content":"
\r\n\tWhat is the installation method of the large shaft of the roller shutter door? The rapid development of China's industrial economy, the current large-scale rapid increase in the demand for shutter doors are widely used in various types of industrial plants, logistics channels, workshops, warehouses, computer rooms, garages and other places. With the improvement of industrial doors series, the use of units on the appearance of the door, wind strength, drive and control systems, manufacturing processes and the use of life and other reasonable demands are also getting higher and higher. It is understood that industrial doors is to meet the requirements of this market and design a new generation of products.<\/span>
\r\n1. Fast shutter doors Large shaft installation, first set the direction of the hanging plate mounted to the reel, and then 4-6 pieces of curtain plate mounted to the hanging plate and tighten the scroll in the wire on the scroll bar.<\/span>
\r\n2. Lifting fast shutter door axis, we must pay attention to safety, set up special command, ladder, scaffolding, chain hoists have to be checked. Fast shutter doors installed first put the bearing and the seat of the optical axis into the reel end hole, the alignment position after the bearing fixing bolts tighten.<\/span>
\r\n3. After the reel is ready, move the reel adjustment position to the left or right. At the same time with the level of the horizontal tube and review the level of the scroll. After adjustment, the optical axis and the reel are fully welded, and the optical axis and bearing are fixed with the head screw.<\/span>
\r\n4. Reel when lifting to pay special attention not to touch the roll in the axis of the curtain plate, when tied with steel wire to pad wood.<\/span>
\r\nThe above is on the fast shutter doors how to install the large axis of the introduction, if there is any doubt you can contact our online customer service Oh, we will answer you one by one. Finally, Guangzhou Wansheng Door Industry Co., Ltd. I wish you a happy life, thank you for your reading!<\/span> \r\n<\/p>","url":"\/index.php?m=News&a=show&id=52&l=en","template":"","posid":"1","status":"1","recommend":"0","readgroup":"","readpoint":"0","listorder":"0","hits":"626","createtime":"1447898989","updatetime":"1484359910","lang":"4","pic":"","posimg":"","source":"","date":"2015-11-19"},{"id":"51","catid":"41","userid":"1","username":"admin","title":"Fast gate how to achieve energy-saving effect","title_style":"","thumb":"","keywords":"","description":"","content":"
\r\n\t<\/div>\r\n<\/div>\r\n
","url":"\/index.php?m=News&a=show&id=51&l=en","template":"","posid":"1","status":"1","recommend":"0","readgroup":"","readpoint":"0","listorder":"0","hits":"670","createtime":"1447897237","updatetime":"1484359987","lang":"4","pic":"","posimg":"","source":"","date":"2015-11-19"}],"p":3,"catid":33,"l":"en"}